You are here: Home > News > Industry News > Stainless steel pipe project for 800,000 square meters/natural gas liquefaction plant

Stainless steel pipe project for 800,000 square meters/natural gas liquefaction plant

The project was used in Shanxi Guoxin Liquefied Coal Seam Company

Equipment performance requirements: daily processing 800,000 square-scale natural gas liquefaction plant equipment, this equipment features: he is the first domestic natural gas liquefaction project using waste heat steam drag mixing refrigerant compressor; the first supporting domestic low temperature labyrinth compression Machine, low temperature BOG labyrinth compressor has the characteristics of simple process, small floor space and low energy consumption.

 

Why choose "zheheng Steel's stainless steel pipe"

 

First of all, our company has obtained the national A2 (1), B (2) special equipment manufacturing license (pressure pipe components), certificate number: TS2710T63-2015, the certificate is issued by the National Pressure Pipeline Association after a very rigorous test and test There are a few domestic ones,

 

Secondly, our company has many years of experience and long-term experience in the pressure equipment industry.

 

After field visits by Shanxi Guoxin Company and on-site testing of our company's stainless steel pipe products, they were quite satisfied with our products and finally chose our company.

 

WALL THCKNESS  FOR STAINLESS STEEL PIPE &T UBE  (ASME B36.10 & B36.19)

DNmm DNin φmm SCH5S SCH10S SCH40S
6  1/8 10.3   1.24 1.73
8  1/4 13.7   1.65 2.24
10  3/8 17.1   1.65 2.31
15  1/2 21.3 1.65 2.11 2.77
20  3/4 26.7 1.65 2.11 2.87
25 1 33.4 1.65 2.77 3.38
32 1 1/4 42.2 1.65 2.77 3.56
40 1 1/2 48.3 1.65 2.77 3.68
50 2 60.3 1.65 2.77 3.91
65 2 1/2 76 2.11 3.05 5.16
80 3 88.9 2.11 3.05 5.49
90 3 1/2 101.6 2.11 3.05 5.74
100 4 114.3 2.11 3.05 6.02
125 5 141.3 2.77 3.4 6.55
150 6 168.3 2.77 3.4 7.11
200 8 219.1 2.77 3.76 8.18

 

Then who is “Shanxi Guoxin Liquefaction Company”

“The company is located at No. 6 Chaoyang West Street, Shouyang County, Jinzhong City, Jinzhong City, Shanxi Province. Welcome to understand the specific business. The company mainly operates urban gas supply; toll gas supply service; coalbed methane (natural gas) gas pipeline Management and management of network planning, design and construction; management and implementation of coalbed methane (natural gas) external franchise; management of coalbed methane (natural gas) transmission and distribution, storage and transportation; development and utilization of coalbed methane (natural gas) and consulting services; coalbed methane (natural gas) Organization management of gas station construction; management of compressed coalbed methane (natural gas) and liquefied coalbed methane (natural gas) operations.

 

In the manufacture of stainless steel pipes, we always adhere to the principle of quality first, to provide customers with the safest and most reliable stainless steel pipes.

Previous: >>   304 stainless steel pipe specification Next: >>   November Latest Top 10 Organic Competitors for Stainless Steel Pipe China