You are here: Home > News > Company News > Pre-buried stainless steel pipe and stainless steel pipe fittings raw material supply

Pre-buried stainless steel pipe and stainless steel pipe fittings raw material supply

Entrusted by the owner, "Zheheng Steel" announced on December 6, 2018 that the Changlongshan Pumped Storage Power Station electromechanical installation and plant concrete project pre-buried stainless steel pipe and pipe fittings procurement bid winners public announcement; Project Description: Changlongshan Pumped Storage Power Station Mechanical and electrical installation and plant concrete engineering pre-buried stainless steel pipe and pipe fittings procurement bidding candidate public notice (tender number: TGT-CLS-SB201912D) public notice end time: December 10, 2018 I. Bid evaluation situation (package) [ 001] Changlongshan Pumped Storage Power Station Electromechanical Installation and Plant Concrete Project Pre-buried Stainless Steel Pipe and Pipeline Accessories Procurement: 1. The winner of the successful bidding candidate: 1st place, bidding price: 720.9876 million yuan.

 

Description  Grade size QTY(PCS) WET (KGS)
SMLS PIPES & TUBES TP304L 273*9 333 118253
SMLS PIPES & TUBES TP304L 273*10 123 48348
SMLS PIPES & TUBES TP304L 325*8 95 36007
SMLS PIPES & TUBES TP304L 325*9 158 67160


Changlongshan Pumped Storage Power Station, the site of the project is located in Anji Tianhuangping Town and Shanchuan Township. It is echoed by the Tianhuangping Pumped Storage Power Station, which was completed and put into operation 15 years ago. It belongs to two world-class pumped storages in one area. Power station "sister flowers."


The Changlongshan Pumped Storage Power Station is planned to install 6 generator sets with a total installed capacity of 2.1 million kilowatts, mainly consisting of the upper reservoir, the lower reservoir, the water delivery system, the underground powerhouse and the ground switch station. The static investment of the project is 7.9 billion yuan with a total investment of 10.2 billion yuan. After the project is completed, it will provide support for “West-East Power Transmission”.


Starting from the construction of the Tianhuangping Pumped Storage Power Station in Anji County in 1992. When the project is selected at the beginning of the project, it is divided into the first phase and the second phase. At that time, as an important power distribution project of East China Power Grid, the first phase of the project (the completed Tianhuangping Pumped Storage Power Station) was rapidly advanced under the efforts of governments at all levels.

 

In the first phase of the project, the first unit was put into operation in January 1998, with a total investment of 7.377 billion. After eight years of hard work, all of them were completed and put into production at the end of December 2000.

 

With the rapid economic and social development of the Yangtze River Delta and the expansion of the East China Power Grid, the second phase of the project was also put on the agenda. According to historical records, in August 2001, the county party committee and county government funded the pre-feasibility study of the “Tianji” project. In 2004, when the provincial party committee and the provincial government pleaded for the acceleration of the project, Xi Jinping, who was then secretary of the Zhejiang Provincial Party Committee, was obtained. Comrades' instructions: We should actively promote the "Tianji Project".

 

"Zheheng Steel" specializes in stainless steel pipe and stainless steel pipe fittings with more than 10 years of experience. We are committed to providing customers with the highest quality stainless steel pipes and solutions.

Previous: >>   New supplier to Hehai Rubber for stainless steel seamless pipe Next: >>   Simply recommend a few china stainless steel pipe manufacturers ?